Orlando Website Design by CREATE180 Design

Central Florida Expressway Authority
Project Type:
Tolling Infrastructure
Services Provided:
Architectural
Structural Engineering
Transportation Engineering
Location: Orange County
Project Status: Complete 2008
Client Description:
Bentley provided architectural, civil engineering and structural engineering design services for the complete replacement of the Holland East Toll Plaza. Which consisted of a split plaza with both express and manual lanes. Also included in this project was a new ramp plaza adjacent to the existing mainline. To allow for uninterrupted collection of tolls the entire project was phased.